UPDATE: Bankhead Tunnel was put into service after lighting and electrical repairs.
—
PREVIOUS STORY:
MOBILE, Ala.(WALA) – ALDOT is briefly closing the Bankhead Tunnel for the second day in a row for emergency lighting and electrical repairs.
ALDOT stated that it expects the tunnel to be reopened to site visitors by 13:00 in the present day, December thirtieth.
—
Obtain the FOX10 Climate App. Wherever you’re, get life-saving extreme climate alerts and alerts in your location. accessible free of charge in Apple App Store and Google Play store.
Copyright 2022 WALA. All rights reserved.
#Bankhead #Tunnel #reopens #emergency #lighting #electrical #repairs